Features
The 16 lane signal free road network is fully integrated and aligned with the rapid metro route, underpasses and various foot over bridges across major corporate and residential hubs of Gurugram to enable seamless connectivity to DLF 5.
- Installation of Variable Message System (VMS) Boards for live traffic updates, distance to milestones, weather information and live match scores
- Environment friendly LED lights all through the corridor
- Landscaping with about 5000 trees with footpaths and cycling tracks
- Installation of informatory and cautionary road signages and safety median barriers all along the corridor.
- Construction of catch basins in a span of 35 meters equipped with sump wells and auto sensor disposal pumps to recharge underground water level
- All utilities laid in dedicated 5 meters wide utility corridor on either side of the carriageways