Features
The 16-lane signal free road network is fully integrated and aligned with the rapid metro route, underpasses and various foot-over bridges across major corporate and residential hubs of Gurugram to enable seamless connectivity to DLF 5.
- Installation of Variable Message System (VMS) Boards for live traffic updates, distance to milestones, weather information and live match scores
- Environment-friendly LED lights all throughout the corridor
- Landscaping with about 5000 trees with footpaths and cycling tracks
- Installation of informatory and cautionary road signages and safety median barriers all along the corridor.
- Construction of catch basins in a span of 35 meters equipped with sump wells and auto sensor disposal pumps to recharge underground water level
- All utilities laid in dedicated 5 meters utility corridors on either side of the carriageways