Enquire Now 360 Preview

By continuing to register with us, you agree and accept our Privacy Policy and authorize to be contacted.

Project Name: The Arbour

Unit Type Total Units Allotted Balance
4 BR + Utility 1137 1137 0
Parking Spaces (for right to exclusive use) 3411 3411 0

List Of Statutory Approvals

Sr. No. Approvals/NOC Approval no. Date Downloads
1 HARERA registration RC/REP/HARERA/GGM/671/403/2023/15 23.01.2023 Download PDF
2 Zoning plan approval Drg. NO. DTCP 8895 02.01.2023 Download PDF
3 Building Plan / Site Plan Approval ZP-1524/AD(RA)/2023/2097 20.01.2023 Download PDF
4 Earlier Approved Building Plans BS-1 20.01.2023 Download PDF
BS-2 20.01.2023 Download PDF
BS-3 20.01.2023 Download PDF
BS-3 20.01.2023 Download PDF
BS-4 20.01.2023 Download PDF
BS-5 20.01.2023 Download PDF
BS-6 20.01.2023 Download PDF
BS-7 20.01.2023 Download PDF
BS-8 20.01.2023 Download PDF
BS-9 20.01.2023 Download PDF
CS-1 20.01.2023 Download PDF
E-1 20.01.2023 Download PDF
E-2 20.01.2023 Download PDF
E-3 20.01.2023 Download PDF
E-4 20.01.2023 Download PDF
SD-1 20.01.2023 Download PDF
SD-2 20.01.2023 Download PDF
Site plan ST-3 Calculation 20.01.2023 Download PDF
Site Plan ST-1 20.01.2023 Download PDF
Site Plan ST-2 20.01.2023 Download PDF
Site plan ST-3 Calculation 20.01.2023 Download PDF
ST-4 20.01.2023 Download PDF
TA-1 20.01.2023 Download PDF
TA-3 20.01.2023 Download PDF
TA-4 20.01.2023 Download PDF
TA-5 20.01.2023 Download PDF
TA-6 20.01.2023 Download PDF
TA-7 20.01.2023 Download PDF
TA-8 20.01.2023 Download PDF
TA-9 20.01.2023 Download PDF
TA-10 20.01.2023 Download PDF
TB-1 20.01.2023 Download PDF
TB-2 20.01.2023 Download PDF
TB-3 20.01.2023 Download PDF
TB-4 20.01.2023 Download PDF
TB-5 20.01.2023 Download PDF
TB-6 20.01.2023 Download PDF
TB-7 20.01.2023 Download PDF
TB-8 20.01.2023 Download PDF
TB-9 20.01.2023 Download PDF
TB-10 20.01.2023 Download PDF
TC-1 20.01.2023 Download PDF
TC-2 20.01.2023 Download PDF
TC-3 20.01.2023 Download PDF
TC-4 20.01.2023 Download PDF
TC-5 20.01.2023 Download PDF
TC-6 20.01.2023 Download PDF
TC-7 20.01.2023 Download PDF
TC-8 20.01.2023 Download PDF
TC-9 20.01.2023 Download PDF
TC-10 20.01.2023 Download PDF
TD-1 20.01.2023 Download PDF
TD-2 20.01.2023 Download PDF
TD-3 20.01.2023 Download PDF
TD-4 20.01.2023 Download PDF
TD-5 20.01.2023 Download PDF
TD-6 20.01.2023 Download PDF
TD-7 20.01.2023 Download PDF
TD-8 20.01.2023 Download PDF
TD-9 20.01.2023 Download PDF
TD-10 20.01.2023 Download PDF
TE-1 20.01.2023 Download PDF
TE-2 20.01.2023 Download PDF
TE-3 20.01.2023 Download PDF
TE-4 20.01.2023 Download PDF
TE-5 20.01.2023 Download PDF
TE-6 20.01.2023 Download PDF
TE-7 20.01.2023 Download PDF
TE-8 20.01.2023 Download PDF
TE-9 20.01.2023 Download PDF
TE-10 20.01.2023 Download PDF
Toilet 1 20.01.2023 Download PDF
4 Revised Building Plans (In-principally approved) All Floor Section Elevation Site Toilet & Area Calculation Block-A,B 29.04.2024 Download PDF
Basement - 01 North Pocket Only Services Under Tower-A,B,C 20.04.2024 Download PDF
bs-01 BASEMENT -01 NORTTH POCKET TOWER-A, B, C 29.04.2024 Download PDF
BS-02 29.04.2024 Download PDF
BS-03 29.04.2024 Download PDF
BS-3A 28.03.2024 Download PDF
BS-04 29.04.2024 Download PDF
BS-04A 28.03.2024 Download PDF
BS-05 28.03.2024 Download PDF
BS-06 28.03.2024 Download PDF
BS-07 29.04.2024 Download PDF
BS-08 29.04.2024 Download PDF
BS-09 29.04.2024 Download PDF
BS-10 29.04.2024 Download PDF
BS-11 29.04.2024 Download PDF
BS-12 TOWER-D, E 29.04.2024 Download PDF
ELEVATION-1 TOWER-A 29.04.2024 Download PDF
ELEVATION-1 TOWER-B 29.04.2024 Download PDF
ELEVATION-1 TOWER-C 29.04.2024 Download PDF
ELEVATION-2 TB-07 29.04.2024 Download PDF
ELEVATION-2 TOWER-3 29.04.2024 Download PDF
ELEVATION-2 TOWER-A 29.04.2024 Download PDF
ELEVATION-2 TOWER-C 29.04.2024 Download PDF
ELEVATION-2 TOWER-D 29.04.2024 Download PDF
ELEVATION-3 TOWER-D 29.04.2024 Download PDF
ELEVATION-3 TOWER-E 29.04.2024 Download PDF
ELEVATION-3 TB-08 29.04.2024 Download PDF
ELEVATION-3 TOWER-A 29.04.2024 Download PDF
ELEVATION-3 TOWER-C 29.04.2024 Download PDF
ELEVATION TOWER-E 29.04.2024 Download PDF
ENTRANCE GATE DETAIL NORTH G-01 29.04.2024 Download PDF
FAN ROOM DETAIL FR-01 29.04.2024 Download PDF
FLOOR PLAN SECTION ELEVATIO AREA CALCULATION 29.04.2024 Download PDF
GROUND COVERAGE AREA ALCULATION TOWER-B 29.04.2024 Download PDF
GROUND COVERAGE AREA CALCULATION TOWER-C 29.04.2024 Download PDF
GROUND COVERAGE AREA CALCULATION TOWER-E 29.04.2024 Download PDF
GROUND COVERAGE CALCULATION TOWER-D 29.04.2024 Download PDF
RAMP-01 & 02 DETAIL RM-01 29.04.2024 Download PDF
RM-2 RAMP-DETAIL BASEMENT 29.04.2024 Download PDF
Site Plan 28.03.2024 Download PDF
ST-02 29.04.2024 Download PDF
ST-03 29.04.2024 Download PDF
ST-03A 29.04.2024 Download PDF
STILT FLOOR AREA CALCUATION TOWER-A 28.03.2024 Download PDF
STILT FLOOR PLAN AREA CALCULATION TOWER-B 29.04.2024 Download PDF
STILT FLOOR PLAN TOWER-E 29.04.2024 Download PDF
TA-02 GROUND COVERAGE AREA TOWER-A 29.04.2024 Download PDF
TC-01 STILT FLOOR PLANAREA CALCCULATIONTOWER-C 29.04.2024 Download PDF
TD-01 STILT FLOOR AREA CALCULATION TOWER-D 29.04.2024 Download PDF
TD-6 ELEVATION-1 TOWER-D 29.04.2024 Download PDF
TUNNEL DETAIL SECTION ECO BRIDGE SECTION TN-01 29.04.2024 Download PDF
TYPICAL FLOOR TOILET DETAIL TOWER- A,B,C,D & ews 29.04.2024 Download PDF
Sr. No. Approval/ order Memo No. Date Downloads
1 Licence No. 123 of 2012 Endst.No.LC-1994-JE (S)-2012/26407 20.12.2012 Download PDF
2 AAI NOC for height AAI/RHQ/NR/ATM/NOC/2021/476/1957-1960 21.12.2021 Download PDF
3 Forest NOC R7K-K4G-LG2U 15.03.2022 Download PDF
4 Aravali approval 37/MB 27.04.2022 Download PDF
5 Environment Clearance EC22B039HR137715 24.04.2023 Download PDF
5.1 Environment Clearance (Six-monthly compliance report) EC22B039HR137715 01.12.2023 Download PDF
5.2 Environment Clearance (Six-monthly compliance report) EC23B039HR116175 01.12.2023 Download PDF
5.3 Environment Clearance (Six-monthly compliance report) EC23B039HR116175 04.07.2024 Download PDF
6 Mining Approval 1472 31.08.2022 Download PDF
7 Consent to Establish HSPCB/Consent/329962322/GUNOCTE25616299 18.07.2022 Download PDF

Documents

Sr. No. Title Documents
1 Application Form Doenload PDF
2 Allotment Letter Doenload PDF
3 Agreement for Sale Doenload PDF
4 Site Plan Doenload PDF
5 Payment Plan Doenload PDF
6 List of RERA registered brokers Doenload PDF
7 Ongoing litigations Doenload PDF
8 Site Photographs 29.03.24 Doenload PDF
30.04.24 Doenload PDF
19.06.24 Doenload PDF
31.07.24 Doenload PDF
13.11.24 Doenload PDF
Promoter Details
Name DLF Home Developers Limited
Registered Address 1st Floor, DLF Gateway Tower R Block, DLF City, Phase-III Gurugram, Haryana 122002
Corporate/ Office Address 1st Floor, DLF Gateway Tower R Block, DLF City, Phase-III Gurugram, Haryana 122002
Phone No. Mobile : +91-124-4769000, +91-9711080232
Email ID haryanarera@dlf.in
Other Details
Architect Mr. Prateek Bhatnagar
Contractor M/s. DK Nagpal & Associates
Structural Engineer M/s. Thornton Tomasetti
Chartered Accountant Mr. Harsh Deep Sachdeva
MEP Consultant M/s. Arup Consultants
Proof Consultant M/s. LERA Consulting Structural Engineers
Project developed in last 5 years 1. Gardencity Central,
2. Independent Floors at DLF Alameda Sector-73,
3. Independent Floors at DLF City Phase I & II,
4. Independent Floors at DLF City Phase IV,
5. Independent Floors at DLF Gardencity Sector-91/92,
6. Moulsari Enclave
Facilities to be provided by the promoter on the additional land/ area/space, if any, which is not included in the total cost of the project, which the promoter will retain and operate on the commercial basis N/A
Project Status Construction Started
Website Last Updated on: 13.11.2024